Initial survey (Class Entry)

IMRS class entry if done within survey window of the next due survey, it will done as the next survey description and procedure, approval of the technical committee will depend on the previous class society and maintenance of the ship

If done in a period where no survey is due, it will include review of the previous survey items and testing of main machinery and hill items

This include review of the following items:

  1. Construction
  2. Load line
  3. Tonnages
  4. Fire fighting equipment
  5. Anchoring
  6. Safety equipment
  7. Main Engine(s)
  8. Auxiliaries
  9. Compressors and pumps
  10. Steering gear
  11. Propulsion
  12. Boilers
  13. Refrigerated cargo installations
  14. Electrical installations
  15. Cargo gear
  16. Main drawings and plans